the balcony viewFood consultancy
Interim & project support

Interim leadership for food manufacturers.

Senior operational support for food manufacturers and bakery businesses facing growth, change or a gap in leadership.

Work directly with Bart Czempik to connect production, product development, equipment and the commercial decisions behind them.

Practical senior support

A clear remit. Someone to carry it through.

A factory move, a new production line or an expanding range creates work that can be difficult to absorb while the team keeps the business running.

TBV provides interim management and project support around an agreed brief. That can mean leading a defined piece of operational work, supporting an owner through a period of change or coordinating the decisions needed to get a project into production.

Bart brings more than 20 years of food manufacturing experience, including his time as Managing Director of Millennium Dough Company. He works with owners, operators, suppliers and engineers to make decisions that hold up on the factory floor and make commercial sense.

Where TBV can help

Support built around the work.

01

Interim operations

Additional senior capacity when the business needs help to manage change or work through a production problem. Agree priorities, work with the team and follow the effect on output, quality, labour and cost.

Factory & operations experience
02

Bakery scale-up

Bring the product, process and manufacturing plan together. Work through dough handling, fermentation, equipment capability and trials so the next stage of growth has a practical production route.

Bakery consultancy
03

Factory moves & equipment

Connect the layout and equipment choices with how the bakery will run. Review production flow, operator positions, cleaning and maintenance access, then coordinate the brief with suppliers, contractors and engineers.

Project experience
An example from practice

Connecting the dots on a factory move.

On one bakery relocation assignment, Bart reviewed the proposed layout, equipment and automation together with the products the business wanted to develop.

The work included operator support, access for maintenance and cleaning, and how the different sections of the line would work together. Working with the owners, suppliers and contractors, the team revised the layout, equipment selection and controls.

The changes created a better production flow and the ability to make the planned products. The initial interim assignment led to an invitation to stay on.

Working together

Agree the job before starting it.

Understand the situation

Discuss the site, the immediate problem, the people involved and the decision or deadline driving the work.

Define the assignment

Agree the remit, responsibilities, deliverables, time commitment and fees. Set a review point and a clear view of what completion looks like.

Work with the team

Combine site work, supplier coordination and remote support as the brief requires. Review progress against useful operational and commercial measures.

Leave it workable

Hand over the decisions, operating controls and next steps. Where ongoing support is useful, agree its scope and frequency.

Before we start

A few practical questions.

Can support be part-time or ongoing?

Yes. An assignment can be a defined project, an agreed block of days or ongoing part-time support. Site time, remote work, responsibilities and availability are agreed around the brief.

Do you only work with bakeries?

Bakery and pizza manufacturing are core strengths. Wider food manufacturing assignments are considered where Bart’s operational, product development and supplier experience fits the work.

Can you work alongside our engineers and contractors?

Yes. TBV can translate product and bakery operating requirements into a clearer brief, review interfaces between equipment and help coordinate the work. Engineering design, installation and specialist approvals are handled by the appropriately appointed professionals.

How are fees and travel agreed?

Fees, expected days, travel and any additional specialist support are agreed before the assignment starts. TBV supports UK and international projects, with arrangements based on the location and scope.

Need senior support for the next stage?

Tell Bart what you are making, where the work is getting stuck and when you need support. A short outline is enough to start the conversation.

Discuss an interim brief